Skip to main content
Loading…
This section is included in your selections.

A. The engineer or surveyor who made or under whose direction the parcel map was made shall execute and wet sign the following statement on the map:

Engineer’s (Surveyor’s) Statement

This map was prepared by me or under my direction (and was compiled from record data) (and is based upon a field survey) in conformance with the requirements of the Subdivision Map Act and local ordinance at the request of (person authorizing map) on the ____ day of ____, 20__. This parcel map substantially conforms to the approved tentative map and the conditions of approval thereof.

(Signed) _______________________

R.C.E. (or L.S.) No. ______________

If a field survey was performed, the certificate shall also state that all monuments are of the character and occupy the positions indicated on the map, or that they will be set in such positions on or before a specified date prior to issuance of a building permit, and that the monuments are, or will be, sufficient to enable the survey to be retraced.

B. Subject to the provisions of Section 66436 of the Map Act, unless otherwise determined by the advisory agency, a separate certificate, signed and acknowledged by all parties having any record title interest in the real property subdivided, consenting to the preparation and recordation of the parcel map is required; provided, however, that for good and sufficient cause shown by the subdivider, the advisory agency may waive any or all such signatures and/or names and nature of the respective interests otherwise required by Section 66436 of the Map Act at any time after the tentative map is submitted for approval. Such waiver shall be certified by the city engineer. The provisions of Section 16.20.060(B) shall apply to the waiver of signatures of parties owning a recorded interest in, or right to, minerals, including, but not limited to, oil, gas or other hydrocarbon substances, except where the initial gross area of the final parcel map is less than five acres in a residential zone or less than two acres in any zone other than a residential zone.

C. There shall appear on the parcel map a recorder’s statement for execution by the recorder, as follows:

Recorder’s Statement

Filed this ______ day of _______, 20__, at ___ a.m. in Book _____of ______, at page ____, at the request of ___________

Signed ___________________

County Recorder

D. The parcel map, and evidence of record title interest, shall be submitted to the city engineer for his or her examination prior to filing. Within twenty calendar days after receiving the parcel map, such officer shall examine it for the survey information shown thereon and if satisfied that it complies with this title and all required provisions of the Map Act, and that such parcel map is technically correct, the following certificate shall be executed on the map by the city engineer:

City Engineer’s Statement

This map conforms with the requirements of the Subdivision Map Act and local ordinance.

Dated: _________________

Signed _________________

City Engineer

(Ord. 4967 § 1, 2019; Ord. 4817 § 1, 2015; Ord. 3515 § 1, 1993)