Skip to main content
Loading…
This section is included in your selections.

A vesting tentative map shall be filed in the same form and have the same contents, accompanying data and reports and shall be processed in the same manner as set forth in this title for a tentative map except as hereinafter provided:

A. At the time a vesting tentative map is filed, it shall have printed conspicuously on its face the words Vesting Tentative Map.

B. At the time a vesting tentative map is filed, a subdivider may also be required to supply the following information:

1. In the case of optional design subdivisions, a site development plan showing, in general, height, size, and location of buildings, number of dwelling units, number and location of parking spaces, landscape areas, and park sites, if any;

2. Sewer, water, drainage system details (including size and location of all mains) and size, location, and landscaping (and walls) of all streets;

3. Flood control information (as required by the city engineer);

4. Preliminary soils report;

5. Other information which is deemed to be necessary for determining consistency with CEQA, and/or which is necessary to comply with federal or state requirements. (Ord. 3515 § 1, 1993)