Skip to main content
Loading…
This section is included in your selections.

A. A statement by the engineer or surveyor responsible for the survey and final tract map is required. His or her certificate shall give the date of the survey, state that the survey and final tract map were made by him or her or under his or her direction, and that the survey is true and complete as shown. The certificate shall be wet signed by the engineer or surveyor.

B. The statement shall also state that all interior monuments are of the character and occupy the positions indicated on the map, or that they will be set in such positions on or before a specified later date prior to issuance of a building permit. The certificate shall also state that the monuments are, or will be, sufficient to enable the survey to be retraced. (Ord. 4816 § 1, 2015; Ord. 3515 § 1, 1993)