Skip to main content
Loading…
This section is included in your selections.

Whether the advisory agency requires land reservation, dedication or elects to require payment of a fee in-lieu thereof, or a combination thereof, shall be determined by considering the following:

A. The adopted Park Element of the Metropolitan Bakersfield 2010 General Plan;

B. The topography, geology, soils, access, location, and general suitability of the land in the subdivisions available for dedication;

C. The size and shape of the subdivision and land available for dedication;

D. The feasibility of dedication; and

E. The location of existing and proposed park sites and trailways. (Ord. 3646 § 1, 1995; Ord. 3317 § 1, 1990)