A. Permit Review. Review all development permits to determine:

1. Permit requirements of this chapter have been satisfied, including determination of substantial improvement and substantial damage of existing structures; and

2. All other required state and federal permits have been obtained; and

3. The site is reasonably safe from flooding; and

4. The proposed development does not adversely affect the carrying capacity of areas where base flood elevations have been determined but a floodway has not been designated. This means that the cumulative effect of the proposed development when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than one foot at any point within the city of Bakersfield; and

5. All letters of map revision (LOMRs) for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the “start of construction” definition.

B. Development of Substantial Improvement and Substantial Damage Procedures. For applications for building permits to improve buildings and structures, including alterations, movement, enlargement, replacement, repair, additions, rehabilitations, renovations, substantial improvements, repairs of substantial damage, and any other improvement of or work on such buildings and structures, the floodplain administrator, in coordination with the building official, shall:

1. Estimate the market value, or require the applicant to obtain an appraisal of the market value prepared by a qualified independent appraiser, of the building or structure before the start of construction of the proposed work; in the case of repair, the market value of the building or structure shall be the market value before the damage occurred and before any repairs are made;

2. Compare the cost to perform the improvement, the cost to repair the damaged building to its pre-damaged condition, or the combined costs of improvements and repairs, when applicable, to the market value of the building or structure;

3. Determine and document whether the proposed work constitutes substantial improvement or repair of substantial damage;

4. Notify the applicant when it is determined that the work constitutes substantial improvement or repair of substantial damage and that compliance with the flood resistant construction requirements of the building code is required and notify the applicant when it is determined that work does not constitute substantial improvement or repair of substantial damage;

5. Using FEMA publication FEMA 213, “Answers to Questions About Substantially Damaged Buildings,” develop further detailed procedures for identifying and administering requirements for substantial improvement and substantial damage, to include defining “market value”; and

6. Assure procedures are coordinated with other departments/divisions and implemented by community staff.

C. Review, Use and Development of Other Base Flood Data. When base flood elevation data has not been provided in accordance with Section 15.74.040, the floodplain administrator shall obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal or state agency, or other source, in order to administer Article V of this chapter (Provisions for Flood Hazard Reduction).

Note: A base flood elevation may be obtained using one of two methods from the FEMA publication, FEMA 265, “Managing Floodplain Development in Approximate Zone A Areas—A Guide for Obtaining and Developing Base (100-year) Flood Elevations” dated July 1995.

D. Notification of Other Agencies.

1. Alteration or relocation of a watercourse:

a. Notify adjacent communities and the California Department of Water Resources prior to alteration or relocation;

b. Submit evidence of such notification to the Federal Emergency Management Agency; and

c. Assure that the flood carrying capacity within the altered or relocated portion of said watercourse is maintained.

2. Base flood elevation changes due to physical alterations:

a. Within six months of information becoming available or project completion, whichever comes first, the floodplain administrator shall submit or assure that the permit applicant submits technical or scientific data to FEMA for a letter of map revision (LOMR).

b. All LOMRs for flood control projects are approved prior to the issuance of building permits. Building permits must not be issued based on conditional letters of map revision (CLOMRs). Approved CLOMRs allow construction of the proposed flood control project and land preparation as specified in the “start of construction” definition. Such submissions are necessary so that upon confirmation of those physical changes affecting flooding conditions, risk premium rates and floodplain management requirements are based on current data.

E. Documentation of Floodplain Development. Obtain and maintain for public inspection and make available as needed the following:

1. Certification required by Sections 15.74.120(C)(1) and 15.74.150 (lowest floor elevations);

2. Certification required by Section 15.74.120(C)(2) (elevation or floodproofing of nonresidential structures);

3. Certification required by Section 15.74.120(C)(3) (wet floodproofing standard);

4. Certification of elevation required by Section 15.74.150 (subdivisions and other proposed development standards);

5. Certification required by Section 15.74.170 (floodway encroachments); and

6. Maintain a record of all variance actions, including justification for their issuance, and report such variances issued to the Federal Emergency Management Agency.

F. Map Determination. Make interpretations where needed, as to the exact location of the boundaries of the areas of special flood hazard, where there appears to be a conflict between a mapped boundary and actual field conditions. The person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in Article VI (Exemption and Appeal Procedures) of this chapter.

G. Remedial Action. Take action to remedy violations of this chapter as specified in Section 15.74.050.

H. Planning. Assure community’s general plan is consistent with floodplain management objectives herein. (Ord. 5062 § 1, 2021; Ord. 4469 § 1, 2007)