Skip to main content
Loading…
This section is included in your selections.

A. The city engineer may suspend a permit for industrial wastewater discharge when such suspension is necessary in order to stop a discharge which presents an actual or threatened hazard to the public health, safety or welfare, to the local environment or to the city’s sewerage system.

B. Any discharger notified of a suspension of his or her industrial wastewater permit shall immediately cease and desist the discharge of all industrial wastewater to the sewerage system. In the event of a failure of the discharger to comply voluntarily with the suspension order, the city engineer or wastewater manager shall take such steps as set forth in this chapter to ensure compliance.

C. The city engineer shall reinstate the industrial wastewater permit upon proof of satisfactory compliance with all discharge requirements of the city. (Ord. 4740 § 1, 2013; Ord. 4198 § 1, 2004; Ord. 3667 § 1, 1995)