Skip to main content
Loading…
This section is included in your selections.

A. Any person desiring to connect to a sewer of the city shall obtain a sewer permit.

B. A sewer permit will not be issued unless the applicant has first obtained approval from the city engineer. A sewer permit will not be issued for any sewer which will convey industrial wastewaters unless the discharger has first obtained a city permit for industrial wastewater discharge.

C. Direct attachment of a sewer six inches or smaller in diameter to a city sewer will be made only after the connection permit and wastewater discharge permit, if required, are obtained and all required fees are paid by the applicant. (Ord. 4740 § 1, 2013; Ord. 3667 § 1, 1995)